A finish schedule is a construction document that inventories every finish material in every room — specifying floor finish, wall finish, ceiling finish, base and casing profiles, door finish, and any specialty finish conditions. It specifies each material by manufacturer, product name, color/model number, size, and installation specification. The finish schedule is part of the construction documents — the authoritative record of what finish material goes where — and is used by the contractor to price, order, and install finishes. A project without a finish schedule relies on the contractor’s memory and the client’s ongoing verbal direction. RainFire Builders prepares a written finish schedule before construction begins, includes it in or as an exhibit to the construction contract, and requires written change order approval for any substitutions.