RainFire Builders manages all required permit inspections on every project — from footing inspection before concrete placement through the final certificate of occupancy. Required inspections for a typical Utah residential project include: footing and foundation before concrete; underground plumbing and electrical rough-in; framing before insulation; MEP rough-in (plumbing, electrical, HVAC) before insulation and drywall; insulation before drywall; and final inspections for each trade culminating in the final building inspection. All inspections are scheduled and tracked by the project manager. Clients receive documentation of every passed inspection at project closeout.