A production schedule is a written, time-sequenced plan organizing every phase of a construction project into a logical order with assigned durations and target dates. A complete schedule includes: every significant phase of work, the trade responsible for each phase, planned start and end dates, predecessor relationships (which phases must complete before others can start), permit inspection hold points, critical material delivery dates, and the planned project completion date. A schedule that lists phases without dates, or without predecessor relationships, is not a production schedule — it is a list. Every RainFire Builders project receives a project-specific production schedule before mobilization, shared with the client in writing.