Every RainFire Builders project begins with a written production schedule — a sequenced, dated plan showing every phase of work, the trade responsible for each phase, and the durations assumed. Schedules are updated weekly and shared with the client, reflecting current progress and projections rather than the original plan. Trade sequencing benefits from in-house self-performance of all ten interior trades — there are no unknown subcontractor availability windows creating unexplained schedule gaps. The schedule is a commitment, not a suggestion, and every change order documents its impact on the project end date before work proceeds.